Buildings & Grounds Committee OKs Data Science Building Design

The Board of Visitors Buildings and Grounds Committee on Friday approved the schematic design of the proposed home of the School of Data Science in the Emmet-Ivy Corridor. The School of Data Science building is scheduled to be the first academic building constructed on the 14.5-acre Emmet-Ivy parcel. As designed, the building will face Emmet Street, with an amphitheater and a retention pond between the building façade and the street. Read more.