URL Link
The Board of Visitors Buildings and Grounds Committee on Friday approved the schematic design of the proposed home of the School of Data Science in the Emmet-Ivy Corridor. The School of Data Science building is scheduled to be the first academic building constructed on the 14.5-acre Emmet-Ivy parcel. As designed, the building will face Emmet Street, with an amphitheater and a retention pond between the building façade and the street. Read more.